Changes
Each recorded change to the machine, before and after, newest first.
-
Before
After
Installed wires follow the available passages and grooves
All 103 conductors have proposed routes. The internal sensor leads share one passage into the foam cavity, and cartridge wires follow the existing paired grooves.
-
Before
After
4 mm flavor lines run from the outlet valves to the glass
Stem reducers and metric rear bulkheads carry continuous black tubing through a smaller dispense opening. The internal returns keep R25 bends.
-
Before
After
Disposal warning letters keep level tops over 45° undersides
Every stroke of the raised disposal warning met its face on a 45° knife edge along its top. Each top is level now, and each underside still rises from the wall at 45°.
-
Before
After
Compressor cable follows the valve-bank gap below the funnel
The shared cable and its end fanouts clear the installed hardware and nearby wires. The fuse leads reach insulated splices beside the power box.
-
Before
After
M5 hinge passages run on as slots through the 45° knuckle faces
Where the lower Y-seam hinge's M5 bore crossed a 45° knuckle face, it left a skin 0.27–0.39 mm thick. Each crossing carries the passage on as a slot instead.
-
Before
After
Receiver tube stops get 3 mm of throat behind them; web feet follow the angled socket
Each pump receiver's tube stops get a 3 mm straight throat behind them, up from 1.25 mm, and the web under the angled lower socket reaches 1.3–1.7 mm lower.